Click on the Project # to download the bid results. Whenever possible, all bids received are scanned and included with the bid tabulation. However, due to file size limits, some results may only include the top three lowest apparent bids. Bid results are posted within three (3) business days of the bid closing date.
Seq. | Project # | Description | Bid Closing | Awarded | Company |
---|---|---|---|---|---|
1 | 10.10.0060 | Apple Valley Airport Taxiway | 02/26/2025 | ||
2 | 10.10.0248 | ARMC Bi-Plane Angio Room | 02/28/2025 | ||
3 | 10.10.1066 & 10.10.1142 | ARMC Sterilization | 01/21/2025 | ||
4 | 10.10.1333
| Rancho Cucamonga New Yard Construction | 01/16/2025 | ||
5 | 10.10.1333 | Rancho Cucamonga New Yard Construction | 01/16/2025 | Abboud Diamond Construction, Inc. | |
6 | 10.10.1333 | Rancho Cucamonga New Yard Construction | 01/16/2025 | CSI Services Armstrong Cal Builders Inc. Horizons Construction Co. RE Chaffee Construction Oakview Construction Inc. WakeCo Inc. D.F. Perez Construction Inc. ARC Construction Inc. Newman Midland Corp. KEMCORP Construction Inc. Diamond Construction Inc. MWC Group Inc.
| |
7 | 10.10.1237 | 800MHz Upgrade Skyland Peak Tower | 01/15/2025 | ||
8 | 10.10.1488 | Base Building Upgrades | 12/11/2024 |
Urban Professional Builders, Inc. | |
9 | 10.10.1493 | SHR SID Orange and Blue Lab Remodel | 11/20/2024 | ||
10 | 10.10.1319 | SB County Animal shelter Bloomington | 11/13/2024 | ||
11 | 10.10.1200 | CF Station 305 Butler Building Acquisition | 09/26/2024 | ||
12 | 10.10.1436 | Mojave Splash Pad Reconstruction | 09/24/2024 | ||
13 | 10.10.1142 | ARMC Sterilization System Installation – Trailer Project | 09/05/2024 | ||
14 | Job Order Contracts | GBJOC19, GEJOC16, MJOC17, DAJOC2, HCGBJOC2, HCGEJOC2, HCMJOC2 | 06/12/2024 | ||
15 | 10.10.1395 | Prado RV Restroom Remodel | 08/21/2024 | ||
16 | 10.10.1424 | Mojave Barns and Corrals Revitalization | 07/17/2024 | ||
17 | 10.10.1397 | Lake Gregory Commerce Prefab Restroom Project | 07/11/2024 | ||
18 | 10.10.1396 | Prado Tent Campground Restroom Addition | 07/11/2024 | ||
19 | 10.10.1400 | Glen Helen Island Tower Building Demo & Amenity Installation | 07/09/2024 |
Dalke and Sons Construction Inc.
| |
20 | 10.10.1398 | Lake Gregory San Mortiz | 07/09/2024 | ||
21 | 10.10.0847 | ARMC Deaerator Replacement | 06/27/2024 | ||
22 | 10.10.1207 | ARMC Behavioral Health Adolescent Building | 06/20/2024 | ||
23 | Job Order Contracts | GBJOC19, GEJOC 16, MJOC17, DAJOC2, HCGBJOC2, HCGEJOC2, HCMJOC2 | 06/12/2024 | ||
24 | 10.10.1195 | Fuel Tank Infrastructure – Phase IV | 06/13/2024 | ||
25 | 10.10.1257 | Prado Regional Park Gatehouse and Monument Sign Replacement | 06/04/2024 | ||
26 | 10.10.1222 | Sheriffs Depart – EVOC Asphalt & Lighting Replacement Bid Results | 04/17/2024 | ||
27 | 10.10.1461 | Chino Airport Vault Upgrade | 04/10/2024 |
Amtek Construction – Non collusion Declaration Amtek Construction – Revised Bid proposal Porterra Builders Inc – Bid Bond Porterra Builders Inc – Non-Collusion Declaration Porterra Builders Inc – Revised Bid proposal Velluntini Corp bda Royal Electric Company – Bid Bond Velluntini Corp bda Royal Electric Company – Revised Bid Proposal and Non Collusion Declaration | |
28 | 10.10.1057 | Elevator Modernization – Elevators 1&2 | 02/22/2024 | ||
29 | 10.10.0696 | Apple Valley Airport Wash Rack | 03/20/2024 | ||
30 | 10.10.1508 | 172 & 351 Building Demolition Project | 01/11/2024 | ||
31 | 10.10.1024 | ISD Radio Site Security Upgrade | 12/05/2023 | ||
32 | 10.10.1402 | Mojave Narrows Dry Campsite Path of Travel/Restroom | 11/15/2023 | ||
33 | 10.10.0989 | 800 MHz Searchlight New Generator | 10/24/2023 | ||
34 | 10.10.1022 | Chino Airport Perimeter Fence Replacement Project
| 10/04/2023 | ||
35 | HCMJOC1 | Healthcare Mechanical Job Order Contract | 07/12/2023 | ||
36 | HCGEJOC1 | Healthcare General Engineering JOC | 07/12/2023 | ||
37 | MJOC16 | Mechanical Job Order Contract | 07/12/2023 | ||
38 | DAJOC1 | Demolition and Abatement JOC | 07/12/2023 | ||
39 | GEJOC15 | General Engineering Job Order Contracts | 07/12/2023 | ||
40 | GBJOC18 | General Building Joc Order Contracts | 07/12/2023 | ||
41 | HCGBJOC1 | Heathcare General Building JOC | 07/12/2023 | ||
42 | 10.10.1011 | 800MHz Upgrades – Cajon Pass Tower | 07/12/2023 | Rasmussen Brothers Construction | |
43 | 10.10.1032 | CF Station 226 New Build | 06/01/2023 |
Robert Clapper Construction Services | |
44 | 10.10.0989 | 800 MHz Searchlight New Generator | 05/18/2023 | Arizona West Builders | |
45 | 10.10.1220 | Sheriff Colorado River Station Remodel | 05/03/2023 |
| |
46 | 10.10.1287 | 303 DA Building Sewer System Upgrade | 03/22/2023 | ||
47 | 10.10.0722 | ARMC Skid Mounted | 03/09/2023 | ||
48 | 10.10.1121 | Yucca Valley Shade Structure Project | 09/28/2022 | ||
49 | 10.10.1151 | WVTC Gun Range A/C Installation | 08/31/2022 | Scorpio Enterprises | |
50 | GBJOC17 | General Building Job Order Contracts | 08/03/2022 | Horizon’s Construction | |
51 | GEJOC14 | General Engineering Job Order Contracts | 08/03/2022 | Horizon’s Construction Co. Int’l, Inc. | |
52 | MJOC15 | Mechanical Job Order Contracts | 08/03/2022 | D. Burke Mechanical Corp | |
53 | 10.10.0768 | ISD Acquisitions and Improvements | 07/21/2022 | ACC Contractors, Inc. | |
54 | 10.10.0990, 10.10.0992 & 10.10.0998 | 800MHz Generator Projects – Sites Lease Through American Tower | 07/12/2022 | Proterra Builders, Inc. | |
55 | 10.10.0246 |
ARMC MRI Replacement | 06/23/2022 | ||
56 | 10.10.1151 | Probation West Valley Training Center – Gun Range A/C Installation Project | 03/31/2022 | Urban Professional Builders | |
57 | 10.10.0819
| ARMC Chain Link Fence Enclosure Project | 03/02/2022 | SJDB, Inc.
| |
58 | 10.10.0923 | 800 Mhz Generator Replacement – Glen Helen Tower Project | 01/20/2022 | Proterra Builders | |
59 | 10.10.0967 | Central Valley Juvenile Hall Detention Center CDJVC Secured Parking Expansion | 12/15/2021 | Angeles Contractor | |
60 | 10.10.0315 Ontario Maple Fence Project | 11/03/2021 | Conejo Construction | ||
61 | Reparian Area Piezometer Installation Project | 10/20/2021 | |||
62 |
| Fuel Tank Infrastructure Phase III | 09/23/2021 | ||
63 |
MJOC14 | Mechanical JOC14 | 08/24/2021 | Los Angeles Air Conditioning Inc | |
64 |
GEJOC13 | General Engineering JOC13 | 08/24/2021 | PUB Construction | |
65 |
GBJOC16 | General Building JOC16 | 08/24/2021 | Exbon Development | |
66 |
10.10.1133 Barstow Lot Acquisition – Bid Tabulation | Barstow Lot Acquisition and Renovation Project | 05/18/2021 | ||
67 | 10.10.0997-10.10.0993 800 Mhz Antenna Generator – Aerojet and Little Sunset Projects | Aerojet and Little Sunset Projects | 01/27/2021 | AToM Engineering Construction Inc | |
68 | 10.10.1089 Yucaipa Regional RV Camping Modular Shower/Restroom Project | Yucaipa Regional RV Camping Modular Shower/Restroom Project | 11/24/2020 | Kasa Construction | |
69 | 10.10.0965 Joshua Tree Government Center – Vehicle Impact | Joshua Tree Government Center – Vehicle Impact | 10/22/2020 | Whitehead Construction | |
70 | GBJOC15 | General Building Job Order Contract | 10/06/2020 | PUB Construction | |
71 | MJOC13 | Mechanical Job Order Contract | 10/06/2020 | Mesa Energy Systems | |
72 | GEJOC12 | General Engineering Job Order Contract | 10/06/2020 | SOL Construction | |
73 | 10.10.0091 – Elephant Mountain Antenna Site Upgrade (Re-Bid) | Elephant Mountain Antenna Site Upgrade | 09/22/2020 | ||
74 | 10.10.0180 – High Desert Detention Center | HDDC Generator Replacement Project – Updated 8-24-2018 | 08/26/2020 | Barkley Andross Corp Stronghold Engineering | |
75 | 0680 – ITD Miro Way Enclosed Storage Garage | Miro Way Enclosed Storage Garage | 06/08/2020 | BWW Company Inc | |
76 | 10.10.0114-323 Building Acquisition and Remodel Design-Build Project | Building Acquisition and Remodel Design-Build | 12/10/2019 | McCarthy | |
77 | 0560-Chino Airport Monitoring Well Installation Phase V | Chino Airport Well Installation | 02/20/2020 | ||
78 | 0572-Whitney Young Modular | Whitney Young Modular | 02/13/2020 | 03/24/2020 | Roadway Engineering & Contracting, Inc |
79 | 0492-Rancho Cucamonga Modular | Rancho Cucamonga Modular | 02/13/2020 | 03/24/2020 | SPAREA |
80 | 10.10.0091-Elephant Mountain Antenna Site Upgrade | Elephant Mountain Antenna Site Upgrade | 02/06/2020 | ||
81 | 0606-Fuel Tank Infrastructure Phase II | Fuel Tank Infrastructure Phase II | 01/08/2020 | ||
82 | Painting and Flooring Job Order Contract (PFJOC10) | Painting and Flooring | 10/24/2019 | 12/17/2019 | |
83 | General Engineering Job Order Contract (GEJOC11) | General Engineering | 10/24/2019 | 12/17/2019 | SJD&B, Inc |
84 | General Building Job Order Contract (GBJOJC14) | General Building Contract | 10/24/2019 | 12/17/2019 | PUB Construction, Inc |
85 | Mechanical Job Order Contract (MJOC12) | Mechanical Contractor | 10/24/2019 | 12/17/2019 | |
86 | 10.10.0265 ARMC Ongology Infusion Clinic | ARMC Ongology Infusion Clinic | 09/26/2019 | 12/17/2019 | Hamel Contracting, Inc (award winner) |
87 | 10.10.0315 Countywide Preschool Department Improvement Project – Ontario | Countywide Preschool Department Improvement Project – Ontario | 08/13/2019 | 12/11/2019 | Cornerstone Renovations (award winner) |
88 | General Building Contractor (GBJOC13) | General Building Contractor | 03/20/2019 | 04/30/2019 | SJD&B, Inc |
89 | General Engineering Contractor (GEJOC10) | General Engineering Contractor | 03/20/2019 | 04/30/2019 | Horizons Construction Company International, Inc. |
90 | Mechanical Contractor (MJOC11) | Mechanical Contractor | 03/20/2019 | 04/30/2019 | Mesa Energy Systems |
91 | Painting and Flooring Contractor (PFJOC9) | Painting and Flooring Contractor | 03/20/2019 | 04/30/2019 | Angeles Contractor |
92 | 10.10.0107 (5X50) | County Government Center Board Chambers Renovation Project | 10/10/2018 | 12/04/2018 | PCN3 |
93 | 10.10.0365 (7X05) | West Valley Detention Center (WVDC) Recreation Yard Enclosures | 09/26/2018 | 12/18/2018 | Asia General Contractors |
94 | 10100375 | Park Moabi Road Repairs | 07/26/2018 | ||
95 | 7G04 | Arrowhead Regional Medical Center-Labor and Delivery Remodel | 05/16/2018 | 08/07/2018 | RS Construction & Development, Inc. |
96 | 1V20 | IT Data Center Generator Replacement and Cooling System Upgrad | 04/26/2018 | 08/07/2018 | Hamel Contracting, Inc. |
97 | MJOC10 | Mechanical Job Order Contract Services | 04/17/2018 | 05/22/2018 | D. Burke Mechanical Corporation |
98 | GBJOC12 | General Building Contractor Job Order Contract Services | 04/17/2018 | 05/22/2018 | PUB Construction |
99 | GEJOC9 | General Engineering Contractor Job Order Contract Services | 04/17/2018 | 05/22/2018 | PUB Construction |
100 | 6T25 | Rancho Courthouse Exterior Cleaning | 04/05/2018 | ||
101 | 6X22 | County Government Center Exterior Cleaning | 04/05/2018 | ||
102 | 070A | Asistencia Mission Sewer Improvements | 04/04/2018 | ||
103 | 6K03 | Lucerne Valley Fire Station No. 8 Remodel | 03/29/2018 | 06/12/2018 | Ely Contracting, Inc. |
104 | 7G08 | Arrowhead Regional Medical Center New CT Scanner | 03/20/2018 | 05/22/2018 | LAH Builders |
105 | PFJOC8 | Painting and Flooring Contractor Job Order Contract (JOC) | 02/01/2018 | ||
106 | 8Q03 | Chino Airport Groundwater Assessment Phase V | 01/23/2018 | 02/13/2018 | Yellow Jacket Drilling |
107 | 7X68 | Trona Library Interior Maintenance | 01/18/2018 | ||
108 | 7X86 | Yucaipa Regional Park Special Events Entry | 12/05/2017 | ||
109 | 6X62 | County Government Center Café and Conference Rooms | 11/16/2017 | 01/23/2018 | Golden Gate Steel, Inc., DBA Golden Gate Construction |
110 | 7X04 | Sheriff’s Training Center Range Restroom Building | 11/14/2017 | 01/09/2018 | Abboud Diamond Construction Inc. |
111 | 5P85 | Barstow Probation Building Improvements | 10/26/2017 | 01/09/2018 | Abboud Diamond Construction |
112 | 5F05 | High Desert Fleet Service Center | 10/11/2017 | 12/19/2017 | Hamel Contracting |
113 | 3D04 | 222 Building Remodel Re-Bid | 09/21/2017 | 11/14/2017 | IPI Construction |
114 | 6W27 | Onyx Peak 800 MHz Solar Upgrade | 09/12/2017 | ||
115 | 6G05 | ARMC Sterile Processing Cart Washer Replacement Re-Bid | 08/30/2017 | 10/30/2017 | D. Burke |
116 | 7K04 | DPW Building Generator | 08/17/2017 | ||
117 | 7X13 | Calico Ghost Town Roof Repairs | 07/19/2017 | 10/03/2017 | Three Peaks Corp |
118 | 7X51 | Youth Justice Center Roof Replacement | 07/19/2017 | 08/22/2017 | Best Contracting Services, Inc. |
119 | Campus Improvements Project-Phase 1B | 06/01/2017 | 08/22/2017 | Roadway Engineering & Contracting Inc. | |
120 | Agriculture Dynamometer | 05/04/2017 | 05/23/2017 | Callison Construction | |
121 | Calico Ghost Town Water Line Replacement | 03/23/2017 | 05/23/2017 | Jacobsson Engineering | |
122 | Yucaipa Regional Park Americans With Disabilities Act Improvement Project | 03/06/2017 | 04/18/2017 | Rasmussen Brothers Construction | |
123 | Apple Valley Airport T-Hanger Improvements | 02/16/2017 | 06/14/2017 | Shanks Electric Corporation | |
124 | Rancho Courthouse DA Remodel | 04/18/2017 | Hamel Contracting | ||
125 | DBH Crisis Residential Treatment Facility Project – Morongo Basin | 01/26/2017 | 02/14/2017 | Hamel Contracting Inc | |
126 | DBH Crisis Residential Treatment Facility Project – Fontana | 01/26/2017 | 02/14/2017 | Hamel Contracting, Inc. | |
127 | DBH Crisis Stabilization Unit Facility Project – Fontana | 01/26/2017 | 02/14/2017 | Oakview Constructors, Inc | |
128 | Forest Falls 800 MHz Antenna Site Upgrade Project | 12/22/2016 | 04/18/2017 | Jitney Company, Inc. | |
129 | Central DRC Electrical Upgrade Project | 12/14/2016 | |||
130 | West Valley Regional Training Center | 11/17/2016 | 02/14/2017 | Act 1 Construction Inc | |
131 | Fleet Management Emergency Infrastructure Fuel Tank Installation Replacement Project | 11/10/2016 | 04/04/2017 | Cora Constructors, Inc. | |
132 | Department of Innovation and Technology Warehouse Project | 11/03/2016 | 01/10/2017 | Cal American Construction, Inc. | |
133 | West Valley Detention Center 800 MHz Antenna Site Upgrade | 10/20/2016 | 01/24/2017 | Dalke & Sons Construction, Inc. | |
134 | DBHealth Crisis Residential Treatment Facility Project – Victorville | 10/13/2016 | 12/06/2016 | Hamel Contracting, Inc. | |
135 | Apple Valley Airport T-Hangar Improvement | 09/29/2016 | Bid withdrawn | ||
136 | Rancho Cucamonga 800MHz Antenna Site Upgrade | 07/21/2016 | 09/27/2016 | Abboud Diamond Construction, Inc. | |
137 | Apple Valley Library Roof Reconstruction | 07/21/2016 | No bids received | ||
138 | West Valley Detention Center Elevator Modernization | 06/30/2016 | 09/13/2016 | Fujitec America, Inc. | |
139 | Hospitality Parking Expansion Project – Phase II | 06/30/2016 | Lee & Stires, Inc. | ||
140 | Yucaipa Regional Park Group Tent Shelter Replacement | 06/29/2016 | 08/18/2016 | Sandwood Enterprises | |
141 | |||||
142 | Sheriff’s Training Center Range Lead Traps – Phase II | 06/27/2016 | 08/23/2016 | Jergensen Construction | |
143 | West Valley Detention Center (WVDC) Recreation Yard Enclosures | 06/27/2016 | 08/23/2016 | Callison Construction | |
144 | Foothill Law & Justice Center Elevator Modernization Project | 06/02/2016 | 08/09/2016 | Angeles Contractor, Inc. | |
145 | Calico Ghost Town Camping Cabin Improvements Project | 05/19/2016 | 07/12/2016 | Three Peaks Corp. | |
146 | Barstow Library Bathroom Remodel | 05/12/2016 | 07/20/2016 | Callison Construction | |
147 | Fire Station 12 Bathroom Remodel Project | 04/28/2016 | 08/04/2016 | Muscle Plumbing, Inc. dba Pro Team Plumbing | |
148 | Inland Empire Autism Assessment Center of Excellence Canopy Project | 03/31/2016 | 06/07/2016 | Kana Engineering Group, Inc. | |
149 | Sheriff’s Headquarters Restroom and Locker Remodel Re-bid | 03/17/2016 | 05/24/2016 | Gilman Builders, Inc. | |
150 | Sheriff’s Supplemental Office Space Project- Phase- I- Fencing | 03/15/2016 | 05/24/2016 | D & M Martin Construction, Inc. | |
151 | Painting and Flooring Job Order Contractor | 02/18/2016 | 04/05/2016 | PUB Construction, Inc. | |
152 | Sheriff-Coroner Building Expansion Project | 02/16/2016 | Rasmussen Brothers Construction, Inc. | ||
153 | 4P10 | West Valley Day Reporting Office Expansion Project | 01/28/2016 | 04/05/2016 | Hamel Contracting, Inc. |
154 | 104 4th Street Canopy Addition Re-Bid | 12/15/2015 | 04/12/2016 | Torga Electrical | |
155 | Needles Fire Station | 09/21/2015 | 10/20/2015 | D. Webb, Incorporated | |
156 | Fire Station No. 92 Covered Parking Project | 09/21/2015 | 01/05/2015 | Modern Day Construction | |
157 | Fire Station No. 94 Covered Parking Project | 09/21/2015 | 11/05/2015 | Modern Day Construction | |
158 | Barstow Service Center Expansion | 09/10/2015 | 10/20/2015 | D. Webb, Incorporated | |
159 | Department of Innovation and Technology Data Center Power Project | 07/20/2015 | 08/25/2015 | R.I.C Construction, Co. | |
160 | Re-bid Sheriff’s Residence Post Security Fence Install | 07/10/2015 | 08/27/2015 | D. Webb, Incorporated | |
161 | 4W01 | Rialto 800 Mhz Antenna Site | 06/25/2015 | 08/11/2015 | Woodcliff Corporation |
162 | Calico Ghost Town Off-Highway Vehicle Campground Hookups Project | 02/05/2015 | 04/21/2015 | Pro-Craft Construction | |
163 | Juvenile Delinquency Court Upgrade | 01/22/2015 | 03/03/2015 | AMG & Associates, Inc. | |
164 | GHRC Roofing Repair Project – Phase III | 12/17/2014 | 03/03/2015 | Bell Roof Co. Inc. | |
165 | Arrowhead Regional Medical Center Hot/Cold Fresh Food Tray Conveyor System | 12/11/2014 | 02/05/2015 | Blueridge Homes | |
166 | To construct a 20,000 (approx.) square foot forensic crime lab expansion, including specialized furniture, fixtures, and equipment, structural, mechanical, electrical, plumbing, signage/graphics, civil (onsite and offsite), acoustical and interior finishes, security systems as identified in the bid package in San Bernardino California. | 08/21/2014 | 10/07/2014 | AMG & Associates Inc. |